image/svg+xml
LPI
Blocking *
C3
2’-0" max
2’-0" min
Attach reinforcement to top
and bottom flanges with
8d nails at 6" o.c. both sides
with nails staggered to avoid splitting
CANTILEVER DETAIL
23/32" OSB (or equal)
Reinforcement Both Sides
* LPI SolidStart Rim Board,
LVL or LSL may be substituted
for the LP Blocking
APA Rated 23/32" OSB
(or equal) closure, or as
required by code
APA-rated 23/32"
OSB (or equal)
reinforcement both
sides, 4’-0" long
minimum