image/svg+xml
SCL Joists- Lapped Ends
Blocking may be required at supports by project
designer or by code for seismic design
Blocking is Required for all Joists
with Depths Greater that 11-7/8", or
On-Center Spacings Greater than 24",
and for all I-Joists.
B3d
3" Min. Lap
Nail Joists together with a
minimum of Three (3) 10d Face Nails
Nail Joist to
Sill with 3-8d
(2-1/2"x 0.113"Ø) nails