image/svg+xml
Attach reinforcement to
top and bottom flanges with
8d nails at 6" o.c. both sides
with nails staggered to
avoid splitting
LP Solid Start Rim
Board Reinforcement
both sides, 4’-0" long
minimum
LPI
Blocking *
C5
APA Rated 23/32" OSB
(or equal) closure, or
as required by code
Cantilever Detail 1’’ or 1-1/8’’
LP SolidStart Rim Board Both Sides
* LPI SolidStart Rim Board,
LVL or LSL may be substituted
for the LP Blocking
2’-0" max
2’-0" min