Menu
Business Advice3 min

Installation Advice: Should Wall Sheathing Overlap Foundation?

Whether most of your construction projects use engineered wood, plywood or OSB, proper wall sheathing installation helps protect the home from wind and water penetration. Installing wall sheathing panels is fairly straightforward, yet one question we do see on social media is whether sheathing should overlap the foundation.

Should sheathing overlap foundation? 

The advice when installing wall sheathing is to overlap and install flashing, providing a means to direct moisture away from the foundation. Pros often seal the sill when the wall sheathing overlaps the sill plate. The installation instructions for LP WeatherLogic panels are:

  • When the panel is flush with the face of the foundation, provide a 1/2-inch gap between the bottom edge of the panel and the foundation.

  • Attach approved drip edge when required by code.

  • Apply LP WeatherLogic® Seam & Flashing Tape to seal the top of the drip edge. The tape should extend at least 2 inches past each end and extend at least 2 inches onto the panel face and cover all fasteners used to attach the drip edge. 

  • If the fasteners are placed so that the standard 3-3/4-inch tape cannot cover and extend 2 inches onto the panel, use the 6-inch tape or shingle multiple rows of 3-3/4-inch tape so that a layer above overlaps the layer below.

unnamed_900px-wide

Builder Kyle Stumpenhorst of @rrbuildings recently  constructed a 16-foot-tall building with an irregular foundation, and before he started installing LP WeatherLogic panels he marked reference lines. “We’re running our WeatherLogic sheets vertically,” says Stumpenhorst. “We won’t have a consistent, single line because we can’t snap from on our foundation.” Check out the full installation process in the video below.

Stumpenhorst said the foundation had some variances. “We don’t want to start at the foundation and move up. We’re going to mark from the soffit down so we can establish two lines,” he said.  

The 16-foot-tall building naturally aligned with 4-foot by 8-foot dimensions of the LP WeatherLogic panels. “We laid out all the framing so that we would have very little to no waste while installing the sheathing.” In this application, he used a 4-foot piece near the foundation, an 8-foot piece above it, and then a 4-foot piece. For the next section, he installed two 8-foot sections. He finished with the first 4x8x4 combination. 

For more quick tips, be sure to follow #LPQuickTip on Instagram. Want to see more from these pro builders? Check out this modern farmhouse build.

Continue Reading
News & Stories3 min

History of Partnership with Gary Sinise Foundation

The LP Foundation is a proud partner of the Gary Sinise Foundation, which supports wounded veterans in several ways. You can learn more about the LP Foundation here.

Continue Reading

Business Solutions

4 min
Q&A: How Home Orientation Impacts Continuous Insulation

There’s a lot to consider when it comes to building an energy-efficient home for your clients and the many nuances that change with each build—including its orientation to the sun. We sat down with Neil Freidberg, Building Science Manager at LP, to unpack the impact of home orientation on continuous insulation needs. 

Resiliency Solutions

5 min
HOW A RADIANT BARRIER CAN IMPROVE BURIED DUCT PERFORMANCE

One of the questions LP® Building Solutions gets from builders often is about burying ducts in attic insulation and whether combining radiant barrier sheathing with blown insulation over ductwork can benefit homeowners. As with most technical situations, the outcome depends on a nuanced approach. Let’s dig in and explore this question. 

Sustainability Solutions

8 min
How to Drive Effective Communication and Collaboration on the Jobsite

Every jobsite has a ton of moving parts, from product shipments, supplies, and schedules to subcontractors and homeowners. It’s no wonder that many project teams can struggle to maintain quality jobsite communication and collaboration throughout the building process. And when communication slips, construction companies inevitably deal with costly errors, inefficient workflows, delayed projects, or wasted time, leaving clients and the team frustrated.